Contacts
Services
Directions
Expert Witness
Updated:
02/05/2010
Copyright Horizon P.S. 1997-2010
All rights reserved
|
|
ELECTRICAL SYSTEM STUDIES
|
SYSTEM STUDIES
- Complete field survey from utility connection to motor control center and distribution panelboards.
- Provide single line diagram.
- Evaluate equipment capability and protection integrity.
- Complete fault calculations of entire system recommend and coordinate new protection
devices.
PRIMARY SYSTEM STUDIES
- Complete field survey from utility connection to distribution transformer.
- Provide single line diagram.
- Evaluate equipment capacity and protection integrity.
- Complete fault calculation of entire system.
- Recommend and coordinate new protection devices.
EQUIPMENT STUDY
- Complete field survey of existing equipment .
- Evaluate and recommend refurbishing equipment.
- Coordinate contracted services.
- Coordinate with utility and permit agency.
- On-site engineering support during refurbishing.
- Final report and acceptable testing.
- Maintenance and testing schedule.
POWER QUALITY STUDY
- Complete field survey of equipment system.
- Field measurements of harmonic distortion levels.
- Evaluate and recommend mitigation of harmonic and power quality problems.
- Coordinate contracted services.
- On-site engineering support during mitigation work.
- Acceptance testing, final field measurements and report.
- Maintenance and testing schedule.
|
|
|